2nd phase of the New Community Condos of Lake Odessa. Next phase consists of the next set of condos being built now. 1st phase of condos, 5 units, are built and lived in. Condo development in the heart of downtown Lake Odessa. Home of the former high school and west of the old football field will be the new Community Condos. Local builder, All Call Restoration is handling phase 2. Large open floor plans to maximize sunlight and space inside the sq footage.Each condo comes with 1 stall garage and porch. Easy front door entry with no steps. Wide hallways and doorways. Step in shower. Once this last unit in this 2nd phase is sold we will finalize financing and begin construction within 90 days. Entire construction process to take 12 months.
Anno | Valore imposta | |
---|---|---|
2023 | USD $2023 | THB ฿68.652* |
*Il prezzo convertito nella tua valuta è fornito da Open Exchange Rates. I tassi di cambio sono soggetti a continui cambiamenti. thinkofliving.com ed i suoi partner non garantiscono che la conversione rifletta i tassi di cambio attuali e non ne sono responsabili per eventuali inesattezze. thinkofliving.com consiglia di verificare in modo indipendente tutte le informazioni prima di fare affidamento su di esse.
Richiesta email a Tall Tree Realty and Property Management LLC
Immobiliare ID: 110090959102