2nd phase of the New Community Condos of Lake Odessa. Next phase consists of the next set of condos being built now. 1st phase of condos, 5 units, are built and lived in. Condo development in the heart of downtown Lake Odessa. Home of the former high school and west of the old football field will be the new Community Condos. Local builder, All Call Restoration is handling phase 2. Large open floor plans to maximize sunlight and space inside the sq footage.Each condo comes with 1 stall garage and porch. Easy front door entry with no steps. Wide hallways and doorways. Step in shower. Once this last unit in this 2nd phase is sold we will finalize financing and begin construction within 90 days. Entire construction process to take 12 months.
Año | Cantidad de impuestos | |
---|---|---|
2023 | USD $2023 | THB ฿68.679* |
*Precio convertido a su divisa por Open Exchange Rates. Los cambios de divisa estan sujetos a fluctuación continua. Ni thinkofliving.com ni sus afiliados garantizan que los tipos de cambio reflejen los tipos de cambio actuales y no se hacen responsables de ninguna inexactitud. thinkofliving.com recomienda que verifique cualquier información independientemente antes de confiar en ella.
Consulta por correo electrónico a Tall Tree Realty and Property Management LLC
Inmueble ID: 110090959102