2nd phase of the New Community Condos of Lake Odessa. Next phase consists of the next set of condos being built now. 1st phase of condos, 5 units, are built and lived in. Condo development in the heart of downtown Lake Odessa. Home of the former high school and west of the old football field will be the new Community Condos. Local builder, All Call Restoration is handling phase 2. Large open floor plans to maximize sunlight and space inside the sq footage.Each condo comes with 1 stall garage and porch. Easy front door entry with no steps. Wide hallways and doorways. Step in shower. Once this last unit in this 2nd phase is sold we will finalize financing and begin construction within 90 days. Entire construction process to take 12 months.
教育阶段 | 学校名称 | 学区 |
---|---|---|
Elementary | 无法使用 | Lakewood |
High | 无法使用 | Lakewood |
Juniorhigh | 无法使用 | Lakewood |
Middle | 无法使用 | Lakewood |
年份 | 税额 | |
---|---|---|
2023 | USD $2023 | THB ฿70,407* |
*网站显示的当地货币价格是根据Open Exchange Rates汇率换算而来的。汇率会不断的发生变化,无论是thinkofliving.com还是其附属机构都无法担保该换算方式能够100%准确地反映当前的汇率,因此对于可能出现的误差不承担任何责任。thinkofliving.com建议买家自行验证所有信息的准确性。
电子邮件咨询至 Tall Tree Realty and Property Management LLC