Basically New Building on the east end of Grover. Insulated & half finished inside Wing Wall to be built goes with & is inside. Optimal storage for oil field use. Big equipment mechanic. On the Front range this building & lot would cost double.
教育階段 | 學校名稱 | 學區 |
---|---|---|
Elementary | Pawnee | 無法使用 |
電子郵件諮詢至 Equity Colorado-Front Range