New development The Garden In a privileged location in Levada Do Cavalo, the construction of this building consisting of two blocks and has a total of 31 fractions, from T1, T2 and T3, will begin. In block B we have at our disposal this fantastic ground floor with patio that is equivalent to a third floor in relation to the road. A feature of appreciation for the unusual in the 1 bedroom apartment is that it has 2 bathrooms. Start of works scheduled for late 2024/beginning 2025 and construction duration of 24 months. For more information do not hesitate to contact! Paulo Silva (+351) 936 752 752 "call to national mobile network" #opaulosilvadaprediclub
Email enquiry to Michelangeli De Sousa, Unipessoal Lda
Properti ID: 120094501812