The industrial park is located within the new section of the Teya-Mrida highway in Oncn municipality of Mrida, Yucatn, which began its construction in October 2022 due to the Mayan train, which will be of high tourist demand and will provide services to more than three thousand users a day. Approximately 1, 525 km of railroads will be built that will cross the states of Tabasco, Chiapas, Campeche, Yucatn and Quintana Roo, benefiting development in the region and the quality of life of the inhabitants. The park has 134 industrial plots, on a lot of 33.89 hectares, lots with surfaces between 1, 200 m2, 1, 600m2 and 2, 000 m2. The Master Plan: Public transport stop 1 lot for trading 1 office lot Control booth Roundabout with monumental access motif. Trailer Park with drop-off area for drivers. Men's and women's toilets with lockers and dressing rooms. Employee parking. Cowork with 5 boardrooms, administration and restrooms for women and men. Dining terrace with kitchen for concession. Childcare for staff and employees of the complex. Rest squares and linear park. Services: Rooms for equipment, warehouses and garbage. The road section is 22m and is composed of a 16m wide asphalt street, flanked by 3m of sidewalks on each side. The design of the sidewalk contemplates a width of 1.50 m in concrete and 1.50 m wide with gravel as a trench. The employee parking lots and trailer park will use Cruz Maya model adopasto flooring to be permeable, environmentally friendly surfaces. The streets are tree-lined, since on the axis or limit of each land with the next, large foliage trees will be planted. Likewise, the parks will have landscaped areas and wooded areas with local species. Project delivery date: January 2027 Price per m2: $1, 490 m2 (Price may change without notice according to the developer)
ส่งอีเมลสอบถามได้ที่ GV Real Property Services / Gina Velazquez
รหัสอสังหาริมทรัพย์: 310096000958