Details :- Reference: WZHR-T21. Residential building under construction in Okrug Gornji with five apartments, two of which are available on the ground floor and two on the first floor, at a price of €190,000 – €330,000. Each apartment entails a living room, kitchen and dining room as one unit, two bedrooms, bathroom, hallway and a balcony or terrace. Each apartment includes one outdoor parking space. Apartments S1 and S2 on the ground floor comprise a garden area, and apartment S1 also a large swimming pool of 36 m2 (with readied heating installations) together with sun deck and an additional garden area. Apartments individually:<br />Apartment S1 (ground floor): 55.60 m2 interior space, 17.40 m2 covered terrace, approx. 50 m2 sunbathing area with pool, approx. 80 m2 of garden space, parking space, for 87.30 m2 of net living space, at a price of €330,000;<br />Apartment S2 (ground floor): 56.60 m2 interior space, approx. 30 m2 of garden space, parking space, for 62.10 m2 of net living space, at a price of €190,000;<br />Apartment S3 (first floor): 57.76 m2 interior space, 17.40 m2 covered balcony, parking space, for 68.96 m2 net living space, at a price of €210,000;<br />Apartment S4 (first floor): 54.45 m2 interior space, 6.50 m2 covered terrace, parking space, for 60.20 m2 net living space, at a price of €190,000.<br />All apartments are built to very high standards and are exceptionally equipped, including air conditioning units in every room, underfloor heating in the bathroom and living room (with the option of extending it to the entire apartment if desired), excellent PVC carpentry with triple-pane insulating glass, mosquito nets on all windows and sliding balcony doors, electric blinds on the balcony doors, parquet floors in all rooms, excellently equipped bathrooms and first-class thermal and hydro insulation.<br />The property is located in an extremely attractive location, at a slightly elevated position featuring an excellent view of the sea from all floors. All additional facilities are in the immediate vicinity.<br />The planned completion of the construction works is the summer of 2024, and the expected occupancy is the end of 2024.