.Finca Los Cerezos, a 6.5-hectare estate, which has 144 units of 290 and 320 total meters approx., distributed in 8 blocks.The development will include opening and finishing works for internal streets, leveling and boundary marking, hydraulic work, power lines and lighting, perimeter fencing, gate entrance.-STAGE 1:Realization of general marking of internal streets, prior marking by a surveyor appointed by the company.Opening of structural caissons for the consolidation of streets, providing the necessary materials according to the hydraulic project, finishing in gravel/compacted stabilized.Execution of trenching on the massifs with their interconnections at street crossings, with the placement of precast pipes according to the hydraulic project.Leveling of massifs according to hydraulic project, using surplus earth from the excavation of streets and ditches.STAGE 2:Armed foundations for betting of concrete poles and anchoring of transformers.Placement of concrete poles, according to plan and electrical project.Placement of wooden poles, according to plan and electrical project.Luminaire placement.Placement of internal electrical wiring, transformers and interconnection with electrical supply according to the end of work granted by Edelap.STAGE 3: END OF WORK:The units are marked out by the designated surveyor.Placement of perimeter fence and access gate.Delivery of functional units.Assembly and delivery of folders with hydraulic and electrical projects, environmental impact studies, exploitation of water resources.-
電子郵件諮詢至 CENTURY 21 Uvia